Wastewater treatment plant study activities that have been carried out include:

1. Field survey for installation of Constructed Wetland Study equipment.
2. Installation of Constructed Wetland Study equipment.
3. Planting aquatic plant seeds in each cell, and monitoring them.
4. Measurement and observation of Wetland plants.
5. Taking media samples (soil and water) for laboratory analysis.
6. Process data from measurements and field observations.
7. Preparation of Final Report and Publication.